Sat, Oct 5, 2024

Boilermakers help build world’s largest solar thermal facility

L-92 leads critical work at innovative Ivanpah Valley project

RISING FROM THE floor of California’s Mojave Desert, about 40 miles southwest of Las Vegas, the Ivanpah Solar Electric Generating System’s three 459-foot towers resemble missile launch pads. They are the most visible features of a 3,600-acre development that will use focused sunlight to turn water to steam and steam to electricity.

$14 billion Plant Vogtle gets green light for reactors

THE NUCLEAR REGULATORY Commission (NRC) on Feb. 9 approved the first licenses to build nuclear reactors in the United States in more than 30 years – and much of the skilled labor involved will go to union Boilermakers.

Boilermakers help build first U.S. ultra-supercritical unit

Cutting-edge Turk Plant uses less coal and water, reduces emissions

THE FIRST-EVER commercially-deployed, ultra-supercritical power generation unit in the United States is under construction in southwest Arkansas — and Boilermakers are playing a leading role in the project.

The $2.1 billion, 600-MW J. W. Turk Jr. Plant will feature the latest environmental controls, according to majority owner Southwestern Electric Power Company (SWEPCO), an American Electric Power (AEP) operating company.

Mountaineer plant is first to capture and store CO2 onsite

LAST SEPTEMBER, AMERICAN Electric Power’s (AEP’s) Mountaineer power plant in New Haven, W.Va., began doing something no other plant in the world has ever done. It began capturing carbon dioxide (CO2) from a slipstream of exhaust flue gas and pumping it deep underground below the plant for permanent storage in a saline formation. The validation project required retrofitting an advanced chilled ammonia system to the existing coal-fired plant — work performed by members of Local 667 (Charleston, W.Va.) and other building trades.

Pages

Top